hows the new studio coming?


Ott responded on 02/20/2012
A

Very well.

Chris Umberloid [a.k.a.Warwick Bassmonkey] has been down for a week and between us we built the drum room.

Main structure is complete, most walls are built. Next job is to finish all the little corners and details, sand down the plaster, test out the sound isolation and paint.

Then I have to lay 850 sq. ft. of oak laminate flooring and fit two heavy-duty steel security doors.

Then I have to build all the studio furniture, complete the electrical wiring and ventilation, build and install a toilet, washroom, shower and kitchen, finish the lounge area, install the telephone line and wifi router, build the ceiling cloud, bass traps, absorbers and diffusors and finally install all the equipment.